2019 Capital Improvements Project
Providing a safe and secure entry area to ensure student security is a priority of every school district. Moving all offices and administrative spaces to the front of the building helps accomplish a secure perimeter barrier from the student occupied space. Interconnecting the first and second floor with an internal stair case ensures that all visitors remain within the secured administrative area unless access is granted to the remainder of the building.
A new flexible classroom space to hold a modern, hands-on Home-Ec curriculum that also provides a cafe and lounge style space for students. The space is intended to be flexible to allow faculty shape the space to fit any lesson that is intended to be taught via it’s moveable furniture and open floor plan.
Modernizing the small gym and fitness center gives students broader physical education opportunities and a larger dedicated weight room for phys. ed. and athletics. The balance of the gym maintains ample space for wrestling and cheer practice as well.